Akaz Gas Power Plant

Project details:

Akaz Gas Power Plant (2 X 125 MW) GE Frame 9E The Scope Of Work In This Project is Electro-mechanical as shown below:

Client

LANCO CO. – MINISTRY OF ELECTRICITY

Duration

April 2012 to June 2013

 

Scope of Work:

2 Gas Turbine Frame 9E 240 Ton For Each Unit.

2 Auxiliary Module 52 Ton For Each Unit.

400 KV Switch Yard / 132 KV Switch Yard.

Step up Transformer 160 MVA/ 2 No.

UAT Transformer 8 MVA/ 2 No.

Piping The Total 70,000 dimeter inch.

Water Treatment Plant For The Project.

Laying and Pulling All Power (MV, LV) and Control Cables with a total  of 200KM.

Fire Fighting System & Fire detection system.

Unloading station and forwarding pumps.

2 Generators Alstom 200 Ton for each Generator.

All Stacks, Fin Fan Coolers, Acoustical Enclosure, CO2 system & other Skids

DC & DCs Systems.

Auxiliary Transformer (132KV / 6.6 KV ) 25 MVA/ 2 No & reactor 50 MVA.

Fabrication & Installation LDO Tanks (2 x 6000 m3).

Lighting & lightening system.

HVAC System.

(Gas Regulation System) GRS For The Project.

Fabrication & Installation Demi Water 1X4000   M3, Service Water 1X2300 M3 & fire Water 1 X 2300 M3.

LV & MV Switch Gears.

Black Start Diesel Generator (4.2 MW).