Ninawa Rehabilitation project / GE

Project details:

Engineering, procurement and construction for heavy fuel (Crude Oil) re-construction and re-commissioning for Ninawa Power Station, Iraq for the Owner.

Contractor

General Electrical global services (GE)

Scope of Work:

EPCC Consist:

  • Civil work & steel structure.
  • Mechanical & Piping work.
  • Electrical work.
  • Instrumentation & control work.

Mobilization

  • Site preparation, leveling and access.
  • Construction equipment mobilization.
  • Camp and office mobilization to site (camp, cabins, fences).
  • Engineering Team Mobilization.
  • Communication installation.
  • Water, Sewage, Elect. laydown area.
  • Security establishment.

Engineering:

  • Project P&IDs
  • Tanks Drawings & Calculations
  • Piping Drawings & Calculations
  • Civil Drawings & Calculations
  • Project Fire Alarm & Detection System
  • Project Lighting System Drawings
  • Tanks Cathodic Protection System

Procurement:

  • Tanks Steel Plates
  • Steel Structure
  • Project Piping , Fitings & Valves
  • Project Transformers
  • MV Cables
  • LV & Control Cables
  • Fire Alarm & Detection System
  • MCC002 Panles
  • Switch gears Panels
  • DC-UPS System
  • Tank Gauging System
  • Project Lighting System
  • Motorized  Valves
  • Fire Fighting Equipment
  • Cathodic Protection System
  • Project Cable Tray

Construction:

Dismantling

  • Dismantling all Damaged Tanks
  • Dismantling all Damaged Pipins System
  • Dismantling all Damaged Steel Structures
  • Remove all Damaged Cables
  • Site Clean Up

Civil work

  • Rehabilitate Tanks Foundations
  • Pouring Concrete for Tanks Dyke Wall
  • Pouring Concrete for Pipe Sleepers
  • Rehabilitate of Project Oily & Rain Networks
  • Rehabilitate Cable Ducts Banks
  • Rehabilitate of Tanks Floor
  • Rehabilitate of Adminstration Building
  • Site Leveling with Graveling

Mechanical work:

  • LDO Tanks Erection
  • Raw Crude Oil Tanks Erection
  • Treated Crude Oil Tanks Erection
  • Certified Crude Oil Tanks Erection
  • COTP Skids Installation
  • Pump Skids Installation
  • Project Piping System & Valaves Installation

Electrical works

  • Transforemers Installation
  • Switchgear Panels Installation
  • MCC Panel Installation
  • DC-UPS Sytem Installation
  • Fire Alram & Detection System Installation
  • Tank Gauging System Installation
  • Lightings System Installation
  • MV Cable Pulling & Termination
  • LV Cable Pulling & Termination
  • Cathodic Protection System Installation

Commissioning:

  • Commissioning ,Power Up, Hot Loop & Functional Test for All Switchgears
  • Commissioning ,Power Up & Hot Loop Check for DCS
  • Commissioning ,Power Up, Hot Loop, & Functional Test for UPS/DC
  • Commissioning of DC/UPS Batteries System
  • Commissioning ,Power Up, Hot Loop & Functional Test for MCC02
  • Commissioning of tanks Gauging System
  • Commissioning & Functional Tests Of Cathodic Protection
  • Commissioning & Functional Test of MOV Control System
  • Commissioning & Functional Test of Fire Fighting System
  • Commissioning & Functional Test for Fire Alarm System
  • Commissioning of LDO System
  • Commissioning of CO. System
  • Commissioning & energizing transformers
  • Commissioning, Power-Up & Energizing the Transformers
  • Loop Checks & Functional Test