Ninawa Rehabilitation project / GE
Project details:
Engineering, procurement and construction for heavy fuel (Crude Oil) re-construction and re-commissioning for Ninawa Power Station, Iraq for the Owner.
Contractor
General Electrical global services (GE)
Scope of Work:
EPCC Consist:
- Civil work & steel structure.
- Mechanical & Piping work.
- Electrical work.
- Instrumentation & control work.
Mobilization
- Site preparation, leveling and access.
- Construction equipment mobilization.
- Camp and office mobilization to site (camp, cabins, fences).
- Engineering Team Mobilization.
- Communication installation.
- Water, Sewage, Elect. laydown area.
- Security establishment.
Engineering:
- Project P&IDs
- Tanks Drawings & Calculations
- Piping Drawings & Calculations
- Civil Drawings & Calculations
- Project Fire Alarm & Detection System
- Project Lighting System Drawings
- Tanks Cathodic Protection System
Procurement:
- Tanks Steel Plates
- Steel Structure
- Project Piping , Fitings & Valves
- Project Transformers
- MV Cables
- LV & Control Cables
- Fire Alarm & Detection System
- MCC002 Panles
- Switch gears Panels
- DC-UPS System
- Tank Gauging System
- Project Lighting System
- Motorized Valves
- Fire Fighting Equipment
- Cathodic Protection System
- Project Cable Tray
Construction:
Dismantling
- Dismantling all Damaged Tanks
- Dismantling all Damaged Pipins System
- Dismantling all Damaged Steel Structures
- Remove all Damaged Cables
- Site Clean Up
Civil work
- Rehabilitate Tanks Foundations
- Pouring Concrete for Tanks Dyke Wall
- Pouring Concrete for Pipe Sleepers
- Rehabilitate of Project Oily & Rain Networks
- Rehabilitate Cable Ducts Banks
- Rehabilitate of Tanks Floor
- Rehabilitate of Adminstration Building
- Site Leveling with Graveling
Mechanical work:
- LDO Tanks Erection
- Raw Crude Oil Tanks Erection
- Treated Crude Oil Tanks Erection
- Certified Crude Oil Tanks Erection
- COTP Skids Installation
- Pump Skids Installation
- Project Piping System & Valaves Installation
Electrical works
- Transforemers Installation
- Switchgear Panels Installation
- MCC Panel Installation
- DC-UPS Sytem Installation
- Fire Alram & Detection System Installation
- Tank Gauging System Installation
- Lightings System Installation
- MV Cable Pulling & Termination
- LV Cable Pulling & Termination
- Cathodic Protection System Installation
Commissioning:
- Commissioning ,Power Up, Hot Loop & Functional Test for All Switchgears
- Commissioning ,Power Up & Hot Loop Check for DCS
- Commissioning ,Power Up, Hot Loop, & Functional Test for UPS/DC
- Commissioning of DC/UPS Batteries System
- Commissioning ,Power Up, Hot Loop & Functional Test for MCC02
- Commissioning of tanks Gauging System
- Commissioning & Functional Tests Of Cathodic Protection
- Commissioning & Functional Test of MOV Control System
- Commissioning & Functional Test of Fire Fighting System
- Commissioning & Functional Test for Fire Alarm System
- Commissioning of LDO System
- Commissioning of CO. System
- Commissioning & energizing transformers
- Commissioning, Power-Up & Energizing the Transformers
- Loop Checks & Functional Test